Friday, March 2, 2007

Construction Update


Regardless of the snow we've been having, work continues on the home. I'm most impressed with the roofer who seems to work no matter how cold or bad the weather gets. He just adds a snow shovel and broom to his tool belt.
Below is a picture from the kitchen area looking into the living room. Susie is gathering remnants of copper wire to use for a craft project at girls camp this summer. The other picture is down in the basement looking from the family room into the game room.


The front door was delivered and installed last week.




The electrical and cabling has been completed. And the heat and air guys have finished their work. Below is a view of the network, phone, satellite and theater cabling in the basement storage room. Also a view in the equipment room of the electrical cabling. You should have seen it before they looped everything into the boxes. It looked like a chaos of wires and cables. I'm hopeful they got everything into the right place.
As you'll note on the first picture, they've started to wrap the house this week. We have an inspection today for all the inside electrical, heat and air. Next week we start insulation inside
and masonry work outside. After insulation, the sheet rock work should start on the inside.






No comments: