This past week, most work was completed on the outside of the house. The facia and soffit were installed, as well as the rain guttering. Today we laid out the driveways and concrete pads. That work should start in a week or two.
Inside, all of the sheetrock texturing is complete and they've begun preparation for laying tile. Actual tile work began today and will continue for two weeks. Hopefully, next week we'll see the cabinets installed and the trim carpentry work should begin.